{"id":4695,"date":"2022-06-23T16:31:26","date_gmt":"2022-06-23T14:31:26","guid":{"rendered":"https:\/\/dev21.ecoclime.se\/en\/?post_type=reference&#038;p=4695"},"modified":"2023-05-12T15:52:05","modified_gmt":"2023-05-12T13:52:05","slug":"vilhelmina-kommun","status":"publish","type":"reference","link":"https:\/\/ecoclime.se\/en\/news\/reference\/vilhelmina-kommun\/","title":{"rendered":"Vilhelmina Municipality"},"content":{"rendered":"<h2>Reduced electricity use for heating with<br \/>\nover 75%<\/h2>\n<p><strong>Saxn\u00e4s wastewater treatment plant has a heated area of 80 m\u00b2, which was previously heated with direct-acting electricity. Consumption was previously 36.7 MWh for a normal year. Evertherm&#8217;s ARV system solution was able to replace most of the energy supplied with renewable energy directly from the wastewater.<\/strong><\/p>\n<h3>Results<\/h3>\n<p>After commissioning, the annual electricity consumption for heating is 7,7 MWh, which corresponds to a 79 % reduction in electricity use.<\/p>\n<blockquote><p>&#8220;After two years in operation, electricity consumption for heating has decreased to a quarter, based on recycled energy from wastewater. After all, we have replaced direct-acting electricity with heat recovery, so environmentally and energy-wise it is a direct benefit. It has also been done completely without any operational disruptions which is impressive!&#8221;<\/p><\/blockquote>\n<h5>S\u00f6ren Hagenvald at Vilhelmina Municipality<\/h5>\n<h3>Installation<\/h3>\n<p>The property has converted from direct-acting electricity, to instead source the energy via Evertherm ARV, whose collectors are located directly in the waste water treatment plant&#8217;s final basin. This is done using a 14 kW heat pump that delivers heat to a waterborne aerotemper in the process hall and a fan convector in the office. The installation was commissioned in May 2014 and has since been running without interruption or maintenance, no cleaning of the collector has had to be done and the logging shows that the collector delivers the same power throughout the year.<\/p>\n<p>Based on the positive experience in Saxn\u00e4s, the municipality chose to go ahead and convert its other two wastewater treatment plants, Klimpfj\u00e4ll spring 2016 and Kittelfj\u00e4ll in autumn 2017.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Reduced electricity use for heating with over 75% Saxn\u00e4s wastewater treatment plant has a heated area of 80 m\u00b2, which was previously heated with direct-acting electricity. Consumption was previously 36.7 MWh for a normal year. Evertherm&#8217;s ARV system solution was able to replace most of the energy supplied with renewable energy directly from the wastewater. [&hellip;]<\/p>\n","protected":false},"template":"","tags":[15,14,16],"class_list":["post-4695","reference","type-reference","status-publish","hentry","tag-cirkular-energi","tag-evertherm","tag-industri"],"acf":[],"_links":{"self":[{"href":"https:\/\/ecoclime.se\/en\/wp-json\/wp\/v2\/reference\/4695","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ecoclime.se\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/ecoclime.se\/en\/wp-json\/wp\/v2\/types\/reference"}],"version-history":[{"count":8,"href":"https:\/\/ecoclime.se\/en\/wp-json\/wp\/v2\/reference\/4695\/revisions"}],"predecessor-version":[{"id":9351,"href":"https:\/\/ecoclime.se\/en\/wp-json\/wp\/v2\/reference\/4695\/revisions\/9351"}],"wp:attachment":[{"href":"https:\/\/ecoclime.se\/en\/wp-json\/wp\/v2\/media?parent=4695"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ecoclime.se\/en\/wp-json\/wp\/v2\/tags?post=4695"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}